You need to commit the joint postings run to upload the final interface
file.
-
Navigate to the Report Menu screen. Click .
-
Expand the Accounting (REPORT_ACCOUNT) node.
Double-clicking the categories expand or collapse the category. Clicking the
node icon (

) also expands or collapses the category.
-
Double-click Postings Run (E5_ (_US_E5_INTERFACE).
-
Select the desired accounting run from the Previous Runs
table. You can do this by clicking the accounting run row.
-
Click Commit Run.
-
In the warning message window, click OK to commit the
run.
The joint postings run is committed and finalized. In the Previous
Runs table, the status of the committed run is set to
Y. Once the run is committed, you can view the final
interface file, view the detailed report for the final interface, and upload the final
interface file to the FTP site.